MINING PROPOSALstockpile Material from this stockpile is then fed to a primary sag mill followed by a secondary ball mill The capacity of the processing circuit is approximately 500 000 tonnes per annum based on 24 hour operations From the course ore stock pile ore will be mixed with water and milled to 200 microns before passing to the flotation circuit